|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
|
|
|
|
aeronut |
|
blue sky and tail winds to everyone Ace
Posts: 1,560
Time Online: 28 days 22 hours 31 minutes
|
Thanks for posting your build CDL. i find it very interesting. Have you made a choice of covering systems yet? |
| never surrender; never give-up |
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
I flipped the wing over to install the reinforcing pieces and start on some of the plywood strips.
aeronut your welcome for the thread thanks for letting me post it here. I am leaning heavily in favor of the stewart covering system. I like the idea of no fumigating the work area.
|
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
|
|
|
|
gyrojeffro |
|
Guest User |
Saran wrap is slowly making a comeback, the weight savings from no glue can be huge! Raining cats and dogs! |
|
Logged |
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
I finished the plywood on the left wing all that's left is to varnish and attach the ailerons before covering. Speaking of ailerons i glued on the plywood to the rib ends of the ailerons hopefully they will be ready to attach to the wing soon.
|
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
progress is slowing down with the better weather we've been having but am still working on the aileron
|
|
|
|
|
aeronut |
|
blue sky and tail winds to everyone Ace
Posts: 1,560
Time Online: 28 days 22 hours 31 minutes
|
The work shop looks impressive, as well as your build. Thanks for posting. |
| never surrender; never give-up |
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
got some more parts glued on the aileron today the 1.5mm ply strips glued to the bottom of it
|
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
The angle braces were installed and the plywood strip on the other side of the ailerons was completed today. the aileron is now ready for varnishing and the hinges to be attached. I had a little more time so i fabricated a brake peddle out of aluminum angle. We will see how it works as a heel brake.
|
|
|
|
|
gyrojeffro |
|
Guest User |
Lookin good CD, I hope.to start covering pretty soon, I am making and rigging the controls. |
|
Logged |
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
I glued the ribs to the spars starting to get the second wing assembled. I also cut out another brake peddle, but i forgot to reverse the dimensions and when i was done had another left one, so cut out one more this time it was a right one so now i have 2 lefts and a right. oh well.
|
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
since the rainy day wasn't good for much else i got the drag and compression braces glued into place on my wing. I think i checked hundreds of times for squareness.
|
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
I also put the final touches on my brake peddles, I think i will mount them to cheep scrap plywood to test them before installing them on my good floorboard.
|
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
spent a good part of the day in the shop. I moved some things around the fuselage is out of the little room and the nearly finished wing was moved into it. The second wing is off the table and ready for nose ribs and the fiddly stuff. I cut out nose ribs and did a good sweeping and some organizing. decided i needed another tool box. Its amazing how many tools have been bought or migrated to the airport during this project. I also got some primer on some of the steel fittings.
|
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
I did spend a little time sitting in the fuselage dreaming too
|
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
rained today so to the shop I went. the nose ribs are glued on and i made a template and then used that to cut the plywood for the leading edge wrap for the center section. It was then soaked, strapped and clamped in place to form.
|
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
|
|
|
|
Bob Daly |
|
Ace
Posts: 888
Time Online: 45 days 22 hours 25 minutes
|
Is the diagonal bracing strut between the cabane struts on the left side in the plans? It seems redundant. |
|
Logged |
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
yes Bob the aluminum tube on the left side is per the plans. |
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
the leading edge strip is installed and got the aileron spar glued in. I also glued the wingtip down in place.
|
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
I unstrapped the center leading edge plywood and put a coat of varnish on it and the area it will cover during lunch today, I forgot to take pictures though |
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
i got the second coat of varnish on the inside of the leading edge plywood and the area around where it goes on the center section. I also had time to get the first coat of varnish on the area where the leading edge plywood will go on the wing. |
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
mixed some t-88 over lunch and got the leading edge plywood glued to the center section
|
|
|
|
|
aeronut |
|
blue sky and tail winds to everyone Ace
Posts: 1,560
Time Online: 28 days 22 hours 31 minutes
|
Looks good. I am glad you are keeping on and hope all goes well with the build. The first flight in something that you have created with you own hands is so satisfying and you will not be able to wipe the grin off your face for at least a week. |
| never surrender; never give-up |
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
Thanks aeronut.
The little piet hasn't gotten much attention as work and such is getting into summer hectic gear. I did find a few minutes to get the plywood gusset strip cut and glued to the top of the center section.
|
|
|
|
|
RedBird |
|
Ace
Posts: 1,093
Time Online: 15 days 15 hours 4 minutes
|
I’m really glad you created this thread and keep us up to date from time to time. I’ve had a bunch of R.M.’s plans for many years. Obviously plans quality opposite end of spectrum from max plans 🙄; but it’s good to see someone working through them. |
| Why focus on proving how great you are, when you could focus on becoming better?... |
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
Thanks RedBird. the RW plans aren't as good as the minimax plans most of the time but there are some things easier to read on them. I have the minimax plans too and have looked there to solve a few things as well as the real pietenpol plans. Roger is also good at answering e-mail questions too. There are even a few of TEAMs products in my build as well, like the wing trailing edge. (yea i cheated a little)
Anyway i got the bottom ply strips on the center section wing today.
|
|
|
|
|
cdlwingnut |
|
Ace
Posts: 416
Time Online: 3 days 22 hours 22 minutes
|
I installed the trailing edge to the wing. The leading edge plywood was soaked, clamped, and strapped in place to pre-bend it.
|
|
|
|
|