37787.39 ********** Z-Hi-Max serial number 566 ********* Alan D. Jones *********************************************** Construction start date 28 Aug 1992 _________________________________________________________________ Friday 28 Aug 1992 From 11:45:04 Until 13:25:01 Time logged : 1 hrs 39.9563333 mins Activities: Cut out fuselage side framework _________________________________________________________________ Friday 28 Aug 1992 From 13:35:03 Until 15:50:01 Time logged : 2 hrs 14.972333 mins Activities: Glued and set both fuselage side framework. _________________________________________________________________ Saturday 29 Aug 1992 From 13:50:03 Until 14:15:00 Time logged : 0 hrs 24.957 mins Total Time project: Activities: Removed fuselage sides from table, Trimmed and sanded. _________________________________________________________________ Sunday 30 Aug 1992 From 13:00:10 Until 15:00:28 Time logged : 1 hrs 60 mins Total Time project: Activities: Cut out fuselage plywood skins for the sides. Made other side parts. _________________________________________________________________ Monday 31 Aug 1992 From 12:00:03 Until 15:10:01 Time logged : 3 hrs 10 mins Total Time project: Activities: Cut out fuselage side skins and prepared for glueing. _________________________________________________________________ Monday 31 Aug 1992 From 15:20:02 Until 15:40:07 Time logged : 0 hrs 20.1 mins Total Time project: Activities: Glued skins to framework. _________________________________________________________________ Monday 31 Aug 1992 From 16:30:02 Until 16:50:02 Time logged : 0 hrs 20.01 mins Total Time project: Activities: Worked on bulkhead for station # 4. _________________________________________________________________ Tuesday 01 Sep 1992 From 09:10:04 Until 11:20:02 Time logged : 2 hrs 10 mins Total Time project: Activities: Pulled staples and cut out fuselage truss members. _________________________________________________________________ Tuesday 01 Sep 1992 From 15:25:04 Until 16:00:01 Time logged : 0 hrs 34.95 mins Total Time project: Activities: Test fitting of bulkhead and truss members _________________________________________________________________ Tuesday 01 Sep 1992 From 21:00:03 Until 22:10:01 Time logged : 1 hrs 9.97 mins Total Time project: Activities: Glued in Station #4 bulkhead. _________________________________________________________________ Wednesday 02 Sep 1992 From 15:10:04 Until 16:30:01 Time logged : 1 hrs 19.95 mins Total Time project: Activities: Sanding fuselage sides. _________________________________________________________________ Wednesday 02 Sep 1992 From 20:00:03 Until 23:50:01 Time logged : 3 hrs 50 mins Total Time project: Activities: Glued in fuselage truss crossmembers. _________________________________________________________________ Thursday 03 Sep 1992 From 08:00:03 Until 14:45:02 Time logged : 6 hrs 45 mins Total Time project: Activities: Cutting and glueing fuselage members. _________________________________________________________________ Thursday 03 Sep 1992 From 16:30:03 Until 18:00:01 Time logged : 1 hrs 29.97 mins Total Time project: Activities: Removeing staples and sanding. Cleanup _________________________________________________________________ Friday 04 Sep 1992 From 19:10:09 Until 21:30:02 Time logged : 2 hrs 19.887 mins Total Time project: 26 hrs 28.89 mins Activities: Fuselage work. Top x braces and cabin supports. _________________________________________________________________ Saturday 05 Sep 1992 From 19:10:03 Until 21:35:01 Time logged : 2 hrs 24.958 mins Total Time project: 27 hrs 53.848 mins Activities: More fuselage crossmember and cabin work. Gussets. _________________________________________________________________ Monday 07 Sep 1992 From 09:45:03 Until 11:45:01 Time logged : 1 hrs 59.9707 mins Total Time project: 30 hrs 54.819 mins Activities: Sanding and staple pulling. _________________________________________________________________ Tuesday 08 Sep 1992 From 13:00:03 Until 15:30:01 Time logged : 2 hrs 29.97 mins Total Time project: 33 hrs 24.789 mins Activities: Firewall and tail cap glued on. More fuselage work. _________________________________________________________________ Wednesday 09 Sep 1992 From 13:30:01 Until 15:59:04 Time logged : 2 hrs 29.0503 mins Total Time project: 35 hrs 53.839 mins Activities: Fuselage sub assemblys. _________________________________________________________________ Thursday 10 Sep 1992 From 07:30:01 Until 09:30:01 Time logged : 2 hrs 0.0027 mins Total Time project: 37 hrs 53.842 mins Activities: Fabricated landing gear leg struts. _________________________________________________________________ Thursday 10 Sep 1992 From 13:30:01 Until 18:00:01 Time logged : 4 hrs 30.0043 mins Total Time project: 42 hrs 23.846 mins Activities: More LG work. Sanded on fuselage. _________________________________________________________________ Friday 11 Sep 1992 From 20:00:01 Until 21:45:01 Time logged : 1 hrs 45.007 mins Total Time project: 44 hrs 8.853 mins Activities: Routed Landing gear leg struts. Sanded. _________________________________________________________________ Saturday 12 Sep 1992 From 10:00:02 Until 16:00:01 Time logged : 5 hrs 59.9907 mins Total Time project: 50 hrs 8.844 mins Activities: Cabin rough framepup. _________________________________________________________________ Sunday 13 Sep 1992 From 20:30:01 Until 22:00:01 Time logged : 1 hrs 30.00467 mins Total Time project: 51 hrs 38.849 mins Activities: Rear turtle deck support structure. _________________________________________________________________ Monday 14 Sep 1992 From 08:30:12 Until 13:00:01 Time logged : 4 hrs 29.8113 mins Total Time project: 56 hrs 8.660 mins Activities: Made hinges for pedals and control surfaces. Glued up skin on rear turtle deck. _________________________________________________________________ Monday 14 Sep 1992 From 16:00:00 Until 18:00:01 Time logged : 2 hrs 0.019 mins Total Time project: 58 hrs 8.679 mins Activities: Made rudder pedals and assembled to floorboard. _________________________________________________________________ Tuesday 15 Sep 1992 From 08:30:02 Until 16:00:03 Time logged : 7 hrs 30.0283 mins Total Time project: 65 hrs 38.707 mins Activities: Fabricated Landing gear hardware and parts. _________________________________________________________________ Tuesday 15 Sep 1992 From 17:00:01 Until 18:00:01 Time logged : 1 hrs 0.017 mins Total Time project: 66 hrs 38.724 mins Activities: Landing gear assembly on jig. _________________________________________________________________ Tuesday 15 Sep 1992 From 19:00:01 Until 21:00:01 Time logged : 1 hrs 59.9983 mins Total Time project: 68 hrs 38.722 mins Activities: Landing gear installation. _________________________________________________________________ Wednesday 16 Sep 1992 From 14:00:00 Until 16:30:02 Time logged : 2 hrs 30.0327 mins Total Time project: 71 hrs 8.755 mins Activities: Trimmed rear turtle deck. Made cabane brackets. _________________________________________________________________ Wednesday 16 Sep 1992 From 22:00:01 Until 23:00:01 Time logged : 1 hrs 0.01533 mins Total Time project: 72 hrs 8.770 mins Activities: When to Wacks and tapped steering rod arm. _________________________________________________________________ Thursday 17 Sep 1992 From 09:00:01 Until 16:30:01 Time logged : 7 hrs 30.0083 mins Total Time project: 79 hrs 38.778 mins Activities: Cut out rib gussets. Fabricated cabane struts and brackets. _________________________________________________________________ Thursday 17 Sep 1992 From 18:00:03 Until 20:30:01 Time logged : 2 hrs 29.9703 mins Total Time project: 82 hrs 8.748 mins Activities: Assembled and installed cabanes. Finished rear turtle deck. _________________________________________________________________ Friday 18 Sep 1992 From 09:00:01 Until 12:00:01 Time logged : 3 hrs 0.0123 mins Total Time project: 85 hrs 8.760 mins Activities: Made rib jig and constructed 1st rib. _________________________________________________________________ Friday 18 Sep 1992 From 20:00:03 Until 22:00:01 Time logged : 1 hrs 59.965 mins Total Time project: 87 hrs 8.725 mins Activities: Fabricated control stick parts. _________________________________________________________________ Saturday 19 Sep 1992 From 09:30:01 Until 14:30:01 Time logged : 5 hrs 0.0083 mins Total Time project: 92 hrs 8.733 mins Activities: Set up another rib. pulled staples. Cabin work. Cut out door opening. _________________________________________________________________ Saturday 19 Sep 1992 From 20:00:04 Until 22:15:01 Time logged : 2 hrs 14.9573 mins Total Time project: 94 hrs 23.690 mins Activities: Made cabin overhead pieces. Glued in. _________________________________________________________________ Sunday 20 Sep 1992 From 10:00:01 Until 12:30:01 Time logged : 2 hrs 30.009 mins Total Time project: 96 hrs 53.699 mins Activities: Glued on top cabin skin. _________________________________________________________________ Monday 21 Sep 1992 From 09:00:01 Until 11:00:01 Time logged : 2 hrs 0.0157 mins Total Time project: 98 hrs 53.715 mins Activities: Fit rear windshield. Cut out rear notch in cabin. worked on cabin posts. _________________________________________________________________ Monday 21 Sep 1992 From 18:00:01 Until 20:00:02 Time logged : 2 hrs 0.0157 mins Total Time project: 100 hrs 53.731 mins Activities: Made another rib. Cut out rib parts. _________________________________________________________________ Tuesday 22 Sep 1992 From 09:30:01 Until 14:30:02 Time logged : 5 hrs 0.011 mins Total Time project: 105 hrs 53.742 mins Activities: Cut out and fit inst panel. Cut and fit front windshield. Sanded. _________________________________________________________________ Tuesday 22 Sep 1992 From 20:00:02 Until 22:00:01 Time logged : 1 hrs 59.978 mins Total Time project: 107 hrs 53.720 mins Activities: Worked on control hardware. Made another rib. _________________________________________________________________ Wednesday 23 Sep 1992 From 10:00:02 Until 12:30:01 Time logged : 2 hrs 29.9997 mins Total Time project: 110 hrs 23.720 mins Activities: Worked on control hardware. _________________________________________________________________ Wednesday 23 Sep 1992 From 14:00:00 Until 16:15:02 Time logged : 2 hrs 15.0433 mins Total Time project: 112 hrs 38.763 mins Activities: Constructed door. _________________________________________________________________ Thursday 24 Sep 1992 From 12:00:01 Until 15:00:01 Time logged : 3 hrs 0.007 mins Total Time project: 115 hrs 38.770 mins Activities: Varnished fuselage. Odds and ends. _________________________________________________________________ Friday 25 Sep 1992 From 13:00:01 Until 14:45:02 Time logged : 1 hrs 45.015 mins Total Time project: 117 hrs 23.785 mins Activities: Drilled and installed motor mount lower bracket angle. _________________________________________________________________ Saturday 26 Sep 1992 From 13:00:01 Until 16:40:01 Time logged : 3 hrs 40.0057 mins Total Time project: 121 hrs 3.791 mins Activities: Drilled motormount holes and glued in top fuselage sheet. _________________________________________________________________ Sunday 27 Sep 1992 From 13:00:01 Until 15:40:01 Time logged : 2 hrs 40.006 mins Total Time project: 123 hrs 43.797 mins Activities: Finished front cabin posts. Varnished front deck. _________________________________________________________________ Monday 28 Sep 1992 From 15:00:01 Until 18:30:01 Time logged : 3 hrs 30.004 mins Total Time project: 127 hrs 13.801 mins Activities: Made firewall. Mounted istr panel (test fit). Made a rib. _________________________________________________________________ Tuesday 29 Sep 1992 From 12:00:02 Until 14:15:01 Time logged : 2 hrs 14.9867 mins Total Time project: 129 hrs 28.788 mins Activities: Motor mount in place. Varnished in cabin. _________________________________________________________________ Tuesday 29 Sep 1992 From 22:00:00 Until 22:45:00 Time logged : 0 hrs 45.005 mins Total Time project: 130 hrs 13.793 mins Activities: Test fit windscreens again. _________________________________________________________________ Wednesday 30 Sep 1992 From 10:00:01 Until 11:30:01 Time logged : 1 hrs 30.00533 mins Total Time project: 131 hrs 43.798 mins Activities: Built 2 ribs. _________________________________________________________________ Thursday 01 Oct 1992 From 09:45:01 Until 11:00:01 Time logged : 1 hrs 15.00533 mins Total Time project: 132 hrs 58.803 mins Activities: Made a ribs. sanded in cockpit. _________________________________________________________________ Thursday 01 Oct 1992 From 13:45:00 Until 16:10:01 Time logged : 2 hrs 25.0123 mins Total Time project: 135 hrs 23.815 mins Activities: Fabricated control yoke and stick. varnished on fuselage. _________________________________________________________________ Friday 02 Oct 1992 From 20:00:02 Until 20:40:01 Time logged : 0 hrs 39.99167 mins Total Time project: 136 hrs 3.807 mins Activities: Varnished on fuselage. _________________________________________________________________ Sunday 04 Oct 1992 From 19:30:01 Until 21:00:01 Time logged : 1 hrs 29.99967 mins Total Time project: 137 hrs 33.807 mins Activities: Sanding on fuse. More Fitting on windsheilds. rib work _________________________________________________________________ Monday 05 Oct 1992 From 09:30:01 Until 14:00:01 Time logged : 4 hrs 30 mins Total Time project: 142 hrs 3.807 mins Activities: Fixed gear bushing. Fitted and attached front windshield. Rib work. _________________________________________________________________ Monday 05 Oct 1992 From 15:45:02 Until 16:50:01 Time logged : 1 hrs 4.97633 mins Total Time project: 143 hrs 8.783 mins Activities: Made a rib. _________________________________________________________________ Tuesday 06 Oct 1992 From 13:45:01 Until 16:00:01 Time logged : 2 hrs 15.0073 mins Total Time project: 145 hrs 23.790 mins Activities: Rib work. Varnished _________________________________________________________________ Wednesday 07 Oct 1992 From 12:30:01 Until 16:00:00 Time logged : 3 hrs 29.9993 mins Total Time project: 148 hrs 53.789 mins Activities: Made a rib. Worked on rear windshield. Hung door. _________________________________________________________________ Thursday 08 Oct 1992 From 12:30:01 Until 15:00:01 Time logged : 2 hrs 30.0123 mins Total Time project: 151 hrs 23.801 mins Activities: Made door latch. Made a rib. _________________________________________________________________ Friday 09 Oct 1992 From 09:00:01 Until 14:45:01 Time logged : 5 hrs 45.0013 mins Total Time project: 157 hrs 8.802 mins Activities: Made fin. Made 2 ribs. Cleaned up shop. _________________________________________________________________ Friday 09 Oct 1992 From 22:00:01 Until 23:30:01 Time logged : 1 hrs 30.00233 mins Total Time project: 158 hrs 38.804 mins Activities: Cut hinge slots for rudder. Drilled and installed. _________________________________________________________________ Saturday 10 Oct 1992 From 09:30:01 Until 12:15:04 Time logged : 2 hrs 45.0587 mins Total Time project: 161 hrs 23.863 mins Activities: Cut and fit rudder parts. Glued up. Made rib. _________________________________________________________________ Saturday 10 Oct 1992 From 16:15:02 Until 18:00:01 Time logged : 1 hrs 44.977 mins Total Time project: 163 hrs 8.840 mins Activities: Flipped rudder and glued in gussets. _________________________________________________________________ Saturday 10 Oct 1992 From 18:30:01 Until 20:40:01 Time logged : 2 hrs 10.0093 mins Total Time project: 165 hrs 18.849 mins Activities: Finished up on rudder. Made a rib. _________________________________________________________________ Sunday 11 Oct 1992 From 19:00:01 Until 20:00:02 Time logged : 1 hrs 0.02933 mins Total Time project: 166 hrs 18.878 mins Activities: Layed out horizontal stab on table. Pulled staples from rudder. _________________________________________________________________ Monday 12 Oct 1992 From 09:30:00 Until 12:30:01 Time logged : 3 hrs 0.006 mins Total Time project: 169 hrs 18.88 mins Activities: Cut and fit stab parts. _________________________________________________________________ Monday 12 Oct 1992 From 14:10:01 Until 18:15:00 Time logged : 4 hrs 5.0007 mins Total Time project: 173 hrs 23.88 mins Activities: Assembled and glued stab parts. _________________________________________________________________ Monday 12 Oct 1992 From 20:00:01 Until 21:30:00 Time logged : 1 hrs 30.00067 mins Total Time project: 174 hrs 53.88 mins Activities: Made a rib. Varnished Cabin top. _________________________________________________________________ Tuesday 13 Oct 1992 From 09:00:01 Until 12:30:01 Time logged : 3 hrs 30.0033 mins Total Time project: 178 hrs 23.88 mins Activities: Cut and fit elevator parts. _________________________________________________________________ Tuesday 13 Oct 1992 From 19:30:03 Until 22:00:01 Time logged : 2 hrs 29.9753 mins Total Time project: 180 hrs 53.86 mins Activities: Worked down elevator ribs on one side. Put gussets in other side. _________________________________________________________________ Wednesday 14 Oct 1992 From 08:30:01 Until 11:30:01 Time logged : 3 hrs 0.0037 mins Total Time project: 183 hrs 53.86 mins Activities: Glued in more stab gussets. Sanded. _________________________________________________________________ Wednesday 14 Oct 1992 From 19:15:01 Until 21:30:00 Time logged : 2 hrs 14.9987 mins Total Time project: 186 hrs 8.86 mins Activities: Pulled rib staples. Adjusting stab. _________________________________________________________________ Thursday 15 Oct 1992 From 08:40:02 Until 16:00:01 Time logged : 7 hrs 19.9917 mins Total Time project: 193 hrs 28.85 mins Activities: Sanded and tapered ribs on elevator and rudder. Made ribs. _________________________________________________________________ Friday 16 Oct 1992 From 09:45:02 Until 13:15:01 Time logged : 3 hrs 29.985 mins Total Time project: 196 hrs 58.83 mins Activities: Bolted together stab parts. Hooked up and adjusted elevator. _________________________________________________________________ Saturday 17 Oct 1992 From 12:00:01 Until 15:20:01 Time logged : 3 hrs 20.007 mins Total Time project: 200 hrs 18.84 mins Activities: Fabricated & installed stab brace struts. _________________________________________________________________ Sunday 18 Oct 1992 From 20:00:02 Until 20:30:01 Time logged : 0 hrs 29.99133 mins Total Time project: 200 hrs 48.83 mins Activities: Made fairleads for ruudder cables. _________________________________________________________________ Monday 19 Oct 1992 From 09:00:01 Until 12:40:01 Time logged : 3 hrs 40.006 mins Total Time project: 204 hrs 28.84 mins Activities: Varnished fuselage bottom and rudder fin. Made a rib. _________________________________________________________________ Tuesday 20 Oct 1992 From 09:00:02 Until 11:50:01 Time logged : 2 hrs 49.9893 mins Total Time project: 207 hrs 18.83 mins Activities: Varnished again on fuselage. built a rib. Test fitted rudder cables. _________________________________________________________________ Wednesday 21 Oct 1992 From 09:00:01 Until 12:30:01 Time logged : 3 hrs 29.9967 mins Total Time project: 210 hrs 48.83 mins Activities: Made a rib. Worked on controls again. _________________________________________________________________ Thursday 22 Oct 1992 From 09:00:01 Until 11:55:01 Time logged : 2 hrs 55.0127 mins Total Time project: 213 hrs 43.84 mins Activities: More control systems work. Rudder linkage. _________________________________________________________________ Friday 23 Oct 1992 From 12:30:01 Until 13:25:01 Time logged : 0 hrs 54.99 mins Total Time project: 214 hrs 38.83 mins Activities: Worked on #5 rib. (Ply inserts). Sanding , etc. _________________________________________________________________ Saturday 24 Oct 1992 From 12:50:01 Until 14:25:01 Time logged : 1 hrs 35.00867 mins Total Time project: 216 hrs 13.84 mins Activities: Rib work. Varnished horizontal stab. _________________________________________________________________ Sunday 25 Oct 1992 From 13:30:01 Until 15:15:00 Time logged : 1 hrs 45 mins Total Time project: 217 hrs 58.84 mins Activities: Made another rib. Cut out wing parts. Varnished horizontal stab. _________________________________________________________________ Monday 26 Oct 1992 From 19:00:01 Until 20:20:01 Time logged : 1 hrs 20.00767 mins Total Time project: 219 hrs 18.85 mins Activities: Test fitted seat belts. Rib work. _________________________________________________________________ Tuesday 27 Oct 1992 From 11:07:15 Until 14:58:45 Time logged : 3 hrs 51.4987 mins Total Time project: 223 hrs 10.35 mins Activities: Worked on root and tip ribs. Cut out parts for root and tip ribs. _________________________________________________________________ Wednesday 28 Oct 1992 From 11:19:49 Until 14:11:34 Time logged : 2 hrs 51.7527 mins Total Time project: 226 hrs 1.75 mins Activities: Assembled left rudder cable . Rib work. _________________________________________________________________ Thursday 29 Oct 1992 From 09:21:20 Until 11:11:15 Time logged : 1 hrs 49.915 mins Total Time project: 227 hrs 51.66 mins Activities: Worked on end ribs. _________________________________________________________________ Saturday 31 Oct 1992 From 20:05:07 Until 20:48:03 Time logged : 0 hrs 42.93333 mins Total Time project: 228 hrs 34.59 mins Activities: Pulled staples from root rib 2. Sanded. _________________________________________________________________ Monday 02 Nov 1992 From 09:29:21 Until 11:50:05 Time logged : 2 hrs 20.735 mins Total Time project: 230 hrs 55.32 mins Activities: Layed up last rib in jig. (#24) Worked on root and tip ribs. _________________________________________________________________ Tuesday 03 Nov 1992 From 12:45:04 Until 13:13:01 Time logged : 0 hrs 27.944 mins Total Time project: 231 hrs 23.26 mins Activities: Pulled last rib from jig. Sanded. _________________________________________________________________ Wednesday 04 Nov 1992 From 13:45:05 Until 15:27:03 Time logged : 1 hrs 41.9663 mins Total Time project: 233 hrs 5.23 mins Activities: Made strut brackets for wings. Misc. metal parts fabrication. _________________________________________________________________ Thursday 05 Nov 1992 From 14:02:42 Until 15:01:36 Time logged : 0 hrs 58.892 mins Total Time project: 234 hrs 4.12 mins Activities: Made Metal brackets for aileron cables. _________________________________________________________________ Friday 06 Nov 1992 From 11:05:01 Until 12:20:38 Time logged : 1 hrs 15.61733 mins Total Time project: 235 hrs 19.74 mins Activities: Made wing strut brackets. Completed aileron hinge brackets. _________________________________________________________________ Sunday 08 Nov 1992 From 13:34:06 Until 15:21:31 Time logged : 1 hrs 47.429 mins Total Time project: 237 hrs 7.17 mins Activities: Made parts for lower wing strut carry through. _________________________________________________________________ Monday 09 Nov 1992 From 19:58:53 Until 20:55:36 Time logged : 0 hrs 56.72067 mins Total Time project: 238 hrs 3.89 mins Activities: Made metal parts for wing struts. _________________________________________________________________ Tuesday 10 Nov 1992 From 20:17:43 Until 20:49:34 Time logged : 0 hrs 31.85467 mins Total Time project: 238 hrs 35.74 mins Activities: Wing strut bracket work. _________________________________________________________________ Wednesday 11 Nov 1992 From 19:15:56 Until 20:10:44 Time logged : 0 hrs 34.80833 mins Total Time project: 239 hrs 10.55 mins Activities: Metal hinge bracket work. _________________________________________________________________ Friday 13 Nov 1992 From 08:40:06 Until 10:42:57 Time logged : 2 hrs 2.846 mins Total Time project: 241 hrs 13.40 mins Activities: Cut and fit wing spar parts (rear spars). _________________________________________________________________ Friday 13 Nov 1992 From 11:19:05 Until 11:59:26 Time logged : 0 hrs 40.36 mins Total Time project: 241 hrs 53.76 mins Activities: Glued up rear spar parts _________________________________________________________________ Saturday 14 Nov 1992 From 12:28:19 Until 13:42:23 Time logged : 1 hrs 14.06567 mins Total Time project: 243 hrs 7.83 mins Activities: Spar parts construction. Rib noses. _________________________________________________________________ Monday 16 Nov 1992 From 10:34:26 Until 11:45:04 Time logged : 1 hrs 10.63467 mins Total Time project: 244 hrs 18.46 mins Activities: Cut out rear spar parts. _________________________________________________________________ Monday 16 Nov 1992 From 14:05:25 Until 15:11:45 Time logged : 1 hrs 6.342 mins Total Time project: 245 hrs 24.80 mins Activities: Glued up a rear spar. Sanded ribs _________________________________________________________________ Tuesday 17 Nov 1992 From 12:37:20 Until 13:28:30 Time logged : 0 hrs 51.171 mins Total Time project: 246 hrs 15.97 mins Activities: Glued up remaining spar parts. _________________________________________________________________ Wednesday 18 Nov 1992 From 09:45:40 Until 12:43:18 Time logged : 2 hrs 57.64 mins Total Time project: 249 hrs 13.61 mins Activities: Glued web to right front spar. Glued hinge supports to root and tip ribs. _________________________________________________________________ Thursday 19 Nov 1992 From 10:16:04 Until 13:17:20 Time logged : 3 hrs 1.2727 mins Total Time project: 252 hrs 14.88 mins Activities: Prepared and Glued another front spar web. _________________________________________________________________ Friday 20 Nov 1992 From 13:04:41 Until 16:20:22 Time logged : 3 hrs 15.694 mins Total Time project: 255 hrs 30.57 mins Activities: Glued up a rear spar web. Removed staples from front spar. _________________________________________________________________ Monday 23 Nov 1992 From 12:52:31 Until 15:11:58 Time logged : 2 hrs 19.4567 mins Total Time project: 257 hrs 50.03 mins Activities: Aileron control linkage work. _________________________________________________________________ Wednesday 25 Nov 1992 From 09:28:30 Until 12:08:16 Time logged : 2 hrs 39.77 mins Total Time project: 260 hrs 29.80 mins Activities: Engine assembly and mounting. _________________________________________________________________ Saturday 28 Nov 1992 From 20:15:06 Until 21:03:05 Time logged : 0 hrs 47.976 mins Total Time project: 261 hrs 17.78 mins Activities: jigged up for rear spar. Spinner work. _________________________________________________________________ Thursday 03 Dec 1992 From 10:52:49 Until 16:07:17 Time logged : 5 hrs 14.4777 mins Total Time project: 266 hrs 32.26 mins Activities: Installed engine systems. Spar work. Cowl work. _________________________________________________________________ Saturday 12 Dec 1992 From 09:03:50 Until 10:37:46 Time logged : 1 hrs 33.936 mins Total Time project: 268 hrs 6.20 mins Activities: Engine mounting adjustments. Mounted ignition switch _________________________________________________________________ Monday 14 Dec 1992 From 14:49:25 Until 15:17:04 Time logged : 0 hrs 27.64933 mins Total Time project: 268 hrs 33.85 mins Activities: Hung muffler for test fit. _________________________________________________________________ Monday 14 Dec 1992 From 15:53:06 Until 16:46:59 Time logged : 0 hrs 53.88467 mins Total Time project: 269 hrs 27.73 mins Activities: Misc. details _________________________________________________________________ Tuesday 15 Dec 1992 From 11:33:48 Until 12:51:53 Time logged : 1 hrs 18.08367 mins Total Time project: 270 hrs 45.81 mins Activities: Glued web onto left rear spar. _________________________________________________________________ Tuesday 15 Dec 1992 From 13:44:54 Until 15:14:45 Time logged : 1 hrs 29.84667 mins Total Time project: 272 hrs 15.66 mins Activities: Cut and glued left front spar framework. _________________________________________________________________ Tuesday 15 Dec 1992 From 20:36:23 Until 22:49:25 Time logged : 2 hrs 13.033 mins Total Time project: 274 hrs 28.69 mins Activities: Glued web to left front spar. _________________________________________________________________ Wednesday 16 Dec 1992 From 09:23:43 Until 10:20:43 Time logged : 0 hrs 56.996 mins Total Time project: 275 hrs 25.69 mins Activities: Removed staples from rear spar. Trimmed and sanded ends. _________________________________________________________________ Wednesday 16 Dec 1992 From 10:29:59 Until 11:58:21 Time logged : 1 hrs 28.35733 mins Total Time project: 276 hrs 54.05 mins Activities: Pulled staples from left front spar. Trimmed and sanded. Made wing parts _________________________________________________________________ Wednesday 16 Dec 1992 From 13:11:03 Until 14:59:05 Time logged : 1 hrs 48.0257 mins Total Time project: 278 hrs 42.08 mins Activities: Cut spar gussets for bracket points. Drilled and fit spar brackets for right front. _________________________________________________________________ Wednesday 16 Dec 1992 From 15:03:58 Until 16:44:09 Time logged : 1 hrs 40.1853 mins Total Time project: 280 hrs 22.27 mins Activities: Drilled and mounted all remaining spar brackets. _________________________________________________________________ Thursday 17 Dec 1992 From 10:19:43 Until 13:39:35 Time logged : 3 hrs 19.8663 mins Total Time project: 283 hrs 42.14 mins Activities: Cut bevels in spars. Started right wing assembly. _________________________________________________________________ Saturday 19 Dec 1992 From 12:31:44 Until 13:24:53 Time logged : 0 hrs 53.13933 mins Total Time project: 284 hrs 35.28 mins Activities: Slid ribs onto rear spar. Started right front wing assembly. _________________________________________________________________ Tuesday 22 Dec 1992 From 17:26:32 Until 20:36:01 Time logged : 3 hrs 9.4937 mins Total Time project: 287 hrs 44.77 mins Activities: Cut Drag braces and fit to wing. Glued ribs to front spar. Cowl work. _________________________________________________________________ Monday 28 Dec 1992 From 14:12:11 Until 14:52:00 Time logged : 0 hrs 39.82 mins Total Time project: 288 hrs 24.59 mins Activities: Glued in spar bracket gussets _________________________________________________________________ Tuesday 29 Dec 1992 From 14:10:52 Until 16:43:56 Time logged : 2 hrs 33.0587 mins Total Time project: 290 hrs 57.65 mins Activities: Glued ribs to rear spar. Glued in a couple of drag braces. _________________________________________________________________ Wednesday 30 Dec 1992 From 13:28:36 Until 14:48:52 Time logged : 1 hrs 20.27133 mins Total Time project: 292 hrs 17.92 mins Activities: Glued remaining drag braces. Glued in some compression braces. _________________________________________________________________ Wednesday 30 Dec 1992 From 15:52:33 Until 16:43:50 Time logged : 0 hrs 51.28067 mins Total Time project: 293 hrs 9.20 mins Activities: Glued in remaining compression braces. _________________________________________________________________ Thursday 31 Dec 1992 From 15:19:52 Until 17:45:48 Time logged : 2 hrs 25.9317 mins Total Time project: 295 hrs 35.13 mins Activities: Glued on trailing edge of right wing. _________________________________________________________________ Friday 01 Jan 1993 From 15:04:36 Until 16:51:07 Time logged : 1 hrs 46.5233 mins Total Time project: 297 hrs 21.65 mins Activities: Cut and fit aileron web for right wing _________________________________________________________________ Saturday 02 Jan 1993 From 15:43:53 Until 17:44:02 Time logged : 2 hrs 0.1607 mins Total Time project: 299 hrs 21.81 mins Activities: Glued in Aileron web. Cut out ply for tip rib. _________________________________________________________________ Sunday 03 Jan 1993 From 18:56:54 Until 19:47:38 Time logged : 0 hrs 50.73733 mins Total Time project: 300 hrs 12.55 mins Activities: Glued ply to tip rib. _________________________________________________________________ Monday 04 Jan 1993 From 19:21:38 Until 21:18:28 Time logged : 1 hrs 56.8323 mins Total Time project: 302 hrs 9.38 mins Activities: Glue part of aileron web brace. Installed Aileron hinge in tip rib. _________________________________________________________________ Wednesday 06 Jan 1993 From 19:20:02 Until 19:59:46 Time logged : 0 hrs 39.747 mins Total Time project: 302 hrs 49.13 mins Activities: Glued in more right wing parts. (Ailerons) _________________________________________________________________ Saturday 09 Jan 1993 From 10:09:36 Until 12:31:27 Time logged : 2 hrs 21.854 mins Total Time project: 305 hrs 10.98 mins Activities: Prep and glued in root rib. Glued in remaining Aileron wed braces. _________________________________________________________________ Sunday 10 Jan 1993 From 12:45:34 Until 16:07:56 Time logged : 3 hrs 22.3593 mins Total Time project: 308 hrs 33.34 mins Activities: Flipped wing and glued bottom aileron web braces in. Made wing parts. _________________________________________________________________ Sunday 10 Jan 1993 From 17:23:04 Until 18:45:51 Time logged : 1 hrs 22.787 mins Total Time project: 309 hrs 56.13 mins Activities: Fabricated more wing parts. Worked on cowling. _________________________________________________________________ Monday 11 Jan 1993 From 15:22:27 Until 17:25:21 Time logged : 2 hrs 2.89 mins Total Time project: 311 hrs 59.02 mins Activities: Glued in lower aileron web braces. Glued in aileron nose ribs. _________________________________________________________________ Monday 11 Jan 1993 From 18:16:27 Until 18:54:01 Time logged : 0 hrs 37.56367 mins Total Time project: 312 hrs 36.58 mins Activities: Prepared wing nose ribs for installation. _________________________________________________________________ Tuesday 12 Jan 1993 From 11:35:56 Until 12:47:13 Time logged : 1 hrs 11.30133 mins Total Time project: 313 hrs 47.88 mins Activities: Glued on 8th inch nose ribs. Glued in a strut gusset. _________________________________________________________________ Tuesday 12 Jan 1993 From 13:51:07 Until 15:12:58 Time logged : 1 hrs 21.86233 mins Total Time project: 315 hrs 9.74 mins Activities: Glued in nose rib stringer. _________________________________________________________________ Tuesday 12 Jan 1993 From 19:36:39 Until 20:57:36 Time logged : 1 hrs 20.961 mins Total Time project: 316 hrs 30.70 mins Activities: Glued in remaining quarter inch nose ribs. Misc glueing _________________________________________________________________ Sunday 17 Jan 1993 From 12:57:02 Until 15:37:51 Time logged : 2 hrs 40.8227 mins Total Time project: 319 hrs 11.52 mins Activities: Trimmed leading edge skins to fit. Varnished inside of front spar. _________________________________________________________________ Tuesday 19 Jan 1993 From 14:42:52 Until 17:54:28 Time logged : 3 hrs 11.6063 mins Total Time project: 322 hrs 23.13 mins Activities: Electrical system work. _________________________________________________________________ Wednesday 20 Jan 1993 From 13:49:03 Until 18:05:35 Time logged : 4 hrs 16.5393 mins Total Time project: 326 hrs 39.67 mins Activities: Glued on leading edge skins. _________________________________________________________________ Thursday 21 Jan 1993 From 10:04:27 Until 12:47:25 Time logged : 2 hrs 42.9677 mins Total Time project: 329 hrs 22.64 mins Activities: Removed staples. Sanded and cleaned up wing. _________________________________________________________________ Thursday 21 Jan 1993 From 13:27:30 Until 18:04:15 Time logged : 4 hrs 36.7647 mins Total Time project: 333 hrs 59.40 mins Activities: Framed in for fuel tank. Started cutting out aileron. _________________________________________________________________ Friday 22 Jan 1993 From 19:34:41 Until 20:50:43 Time logged : 1 hrs 16.047 mins Total Time project: 335 hrs 15.45 mins Activities: Cut out aileron. _________________________________________________________________ Saturday 23 Jan 1993 From 19:46:16 Until 21:10:39 Time logged : 1 hrs 24.39867 mins Total Time project: 336 hrs 39.85 mins Activities: Took Aileron off and sanded nose ribs. Odds and ends to wing. _________________________________________________________________ Wednesday 27 Jan 1993 From 13:20:24 Until 14:20:14 Time logged : 0 hrs 59.82967 mins Total Time project: 337 hrs 39.68 mins Activities: Glued rs17 pieces on rear of wing (aileron fairing) _________________________________________________________________ Thursday 28 Jan 1993 From 11:22:39 Until 12:29:54 Time logged : 1 hrs 7.25533 mins Total Time project: 338 hrs 46.94 mins Activities: Glued on aileron center skin. _________________________________________________________________ Thursday 28 Jan 1993 From 15:17:56 Until 17:53:07 Time logged : 2 hrs 35.1907 mins Total Time project: 341 hrs 22.13 mins Activities: Glued in remaining aileron nose skins. _________________________________________________________________ Friday 29 Jan 1993 From 10:14:36 Until 12:22:02 Time logged : 2 hrs 7.4397 mins Total Time project: 343 hrs 29.57 mins Activities: Pulled staples from aileron. Sanded and tested wing fit to fuse. _________________________________________________________________ Sunday 31 Jan 1993 From 10:38:12 Until 13:59:01 Time logged : 3 hrs 20.8197 mins Total Time project: 346 hrs 50.39 mins Activities: Setup left wing parts. Fit root ribs. Cut drag braces. _________________________________________________________________ Sunday 31 Jan 1993 From 15:34:38 Until 18:07:48 Time logged : 2 hrs 33.1823 mins Total Time project: 349 hrs 23.57 mins Activities: Glued all ribs, front and back to spars. Left wing. _________________________________________________________________ Friday 05 Feb 1993 From 11:46:21 Until 14:55:08 Time logged : 3 hrs 8.784 mins Total Time project: 352 hrs 32.35 mins Activities: Glued in drag braces on left wing. _________________________________________________________________ Sunday 07 Feb 1993 From 21:02:24 Until 23:05:03 Time logged : 2 hrs 2.6573 mins Total Time project: 354 hrs 35.01 mins Activities: Cut fit and glued trailing edge parts. _________________________________________________________________ Monday 08 Feb 1993 From 09:29:44 Until 12:56:38 Time logged : 3 hrs 26.8997 mins Total Time project: 358 hrs 1.91 mins Activities: Cut and glued in aileron web for left wing. Misc aileron work. _________________________________________________________________ Monday 08 Feb 1993 From 13:31:13 Until 15:10:08 Time logged : 1 hrs 38.92467 mins Total Time project: 359 hrs 40.83 mins Activities: Cut Nose ribs and aileron nose ribs for left wing _________________________________________________________________ Monday 08 Feb 1993 From 18:39:27 Until 20:32:02 Time logged : 1 hrs 52.595 mins Total Time project: 361 hrs 33.42 mins Activities: Glued in aileron spar. Cut and glued in aileron diags. _________________________________________________________________ Tuesday 09 Feb 1993 From 12:49:26 Until 16:37:34 Time logged : 3 hrs 48.13 mins Total Time project: 365 hrs 21.55 mins Activities: Assembled and glued on root and tip ribs. _________________________________________________________________ Wednesday 10 Feb 1993 From 08:39:26 Until 12:06:52 Time logged : 3 hrs 27.424 mins Total Time project: 368 hrs 48.97 mins Activities: Worked on cabin wing root to accept wing. Trimmed and sanded. _________________________________________________________________ Wednesday 10 Feb 1993 From 12:55:53 Until 15:13:46 Time logged : 2 hrs 17.8927 mins Total Time project: 371 hrs 6.86 mins Activities: Glued in aileron nose ribs. Trimmed front windshield. _________________________________________________________________ Thursday 11 Feb 1993 From 11:15:03 Until 14:42:27 Time logged : 3 hrs 27.404 mins Total Time project: 374 hrs 34.26 mins Activities: Corrected mistake in trailing edge assembly. Glued on nose ribs and stringer. _________________________________________________________________ Friday 12 Feb 1993 From 13:00:50 Until 14:53:50 Time logged : 1 hrs 52.995 mins Total Time project: 376 hrs 27.25 mins Activities: Glued on lower trailing edge gussets. Glued on aileron lower spar. _________________________________________________________________ Tuesday 16 Feb 1993 From 08:58:55 Until 14:15:18 Time logged : 5 hrs 16.3847 mins Total Time project: 381 hrs 43.63 mins Activities: Varnished inside leading edge before skinning. Built left lift strut. _________________________________________________________________ Sunday 21 Feb 1993 From 20:11:12 Until 21:31:21 Time logged : 1 hrs 20.16533 mins Total Time project: 383 hrs 3.80 mins Activities: Taped and varnished leading edge skins. _________________________________________________________________ Wednesday 03 Mar 1993 From 20:52:30 Until 22:30:58 Time logged : 1 hrs 38.46067 mins Total Time project: 384 hrs 42.26 mins Activities: Started skinning left wing. 1 of 3 skins in place. _________________________________________________________________ Thursday 04 Mar 1993 From 09:14:07 Until 10:47:27 Time logged : 1 hrs 33.32733 mins Total Time project: 386 hrs 15.59 mins Activities: Glued on another section of skin on left wing. _________________________________________________________________ Sunday 07 Mar 1993 From 13:37:22 Until 16:18:50 Time logged : 2 hrs 41.4787 mins Total Time project: 388 hrs 57.07 mins Activities: Put last skin on left wing. Glued on end gussets. _________________________________________________________________ Monday 08 Mar 1993 From 13:45:51 Until 15:15:24 Time logged : 1 hrs 29.541 mins Total Time project: 390 hrs 26.61 mins Activities: Cut out left wing aileron. _________________________________________________________________ Monday 08 Mar 1993 From 16:15:12 Until 16:48:33 Time logged : 0 hrs 33.35367 mins Total Time project: 390 hrs 59.96 mins Activities: Sanded on aileron nose ribs. _________________________________________________________________ Monday 08 Mar 1993 From 17:13:10 Until 18:15:34 Time logged : 1 hrs 2.41333 mins Total Time project: 392 hrs 2.37 mins Activities: Glued on aileron fairing top strip. Sealing inside of aileron web _________________________________________________________________ Monday 08 Mar 1993 From 19:16:18 Until 20:41:46 Time logged : 1 hrs 25.47133 mins Total Time project: 393 hrs 27.84 mins Activities: Varnished rest of aileron spar. Ready to skin aileron. _________________________________________________________________ Tuesday 09 Mar 1993 From 10:48:20 Until 14:33:44 Time logged : 3 hrs 45.4087 mins Total Time project: 397 hrs 13.25 mins Activities: Glued on left aileron nose skins. _________________________________________________________________ Wednesday 10 Mar 1993 From 08:16:33 Until 12:03:37 Time logged : 3 hrs 47.0607 mins Total Time project: 401 hrs 0.31 mins Activities: Pulled staples in left wing. Sanded. Test fit aileron. _________________________________________________________________ Wednesday 10 Mar 1993 From 13:25:45 Until 16:36:53 Time logged : 3 hrs 11.1283 mins Total Time project: 404 hrs 11.44 mins Activities: Pulled staples from aileron. Sanded. Framed up for fuel tank. _________________________________________________________________ Thursday 11 Mar 1993 From 09:16:22 Until 11:39:58 Time logged : 2 hrs 23.597 mins Total Time project: 406 hrs 35.04 mins Activities: Sanding and adjusting on wings. _________________________________________________________________ Tuesday 16 Mar 1993 From 19:58:21 Until 21:02:43 Time logged : 1 hrs 4.373 mins Total Time project: 407 hrs 39.41 mins Activities: Fit and drilled rear windshield. _________________________________________________________________ Wednesday 17 Mar 1993 From 16:14:04 Until 17:18:59 Time logged : 1 hrs 4.91667 mins Total Time project: 408 hrs 44.33 mins Activities: Finished mounting rear windshield. _________________________________________________________________ Thursday 18 Mar 1993 From 12:53:09 Until 14:13:43 Time logged : 1 hrs 20.563 mins Total Time project: 410 hrs 4.89 mins Activities: Instrument Panel work. _________________________________________________________________ Tuesday 23 Mar 1993 From 12:18:34 Until 14:05:20 Time logged : 1 hrs 46.7697 mins Total Time project: 411 hrs 51.66 mins Activities: Mounted bottom part of cowl. _________________________________________________________________ Wednesday 24 Mar 1993 From 12:23:40 Until 14:46:43 Time logged : 2 hrs 23.0563 mins Total Time project: 414 hrs 14.72 mins Activities: Completed cowl mounting. _________________________________________________________________ Thursday 25 Mar 1993 From 12:42:12 Until 13:43:32 Time logged : 1 hrs 1.339 mins Total Time project: 415 hrs 16.06 mins Activities: Cut out sparkplug access holes. Routed wires. _________________________________________________________________ Thursday 25 Mar 1993 From 14:02:54 Until 16:31:29 Time logged : 2 hrs 28.5803 mins Total Time project: 417 hrs 44.64 mins Activities: Routed fuel line. Ran wires for tach and cht instruments. _____________________________________________________________________________ Thursday 25 Mar 1993 From 17:14:06 Until 20:30:38 Time logged : 3 hrs 16.55 mins Total Time project: 421 hrs 1.19 mins Activities: Hooked up Tack and CHT. Cut inlets in cowl. Routed pitot tube. _________________________________________________________________ Friday 26 Mar 1992 From 10:00:00 Until 14:00:00 Time logged : 4 hrs 0 mins Total time project: 425 hrs 1.19 mins Activities: Designed and built a throttle quadrant. _________________________________________________________________ Saturday 27 Mar 1993 From 19:02:39 Until 20:41:35 Time logged : 1 hrs 38.947 mins Total Time project: 425 hrs 0.14 mins Activities: Started rigging wings. _________________________________________________________________ Saturday 27 Mar 1993 From 21:46:24 Until 23:25:43 Time logged : 1 hrs 39.32133 mins Total Time project: 426 hrs 39.46 mins Activities: Left wing attach pins in place. Diheadral and washout set. _________________________________________________________________ Sunday 28 Mar 1993 From 11:05:58 Until 13:13:03 Time logged : 2 hrs 7.093 mins Total Time project: 428 hrs 46.55 mins Activities: Drilled remaining strut holes. Rigging complete. _________________________________________________________________ Tuesday 30 Mar 1993 From 19:52:07 Until 20:30:09 Time logged : 0 hrs 38.03133 mins Total Time project: 429 hrs 24.66 mins Activities: Minor hose routing. (Static and fuel) _________________________________________________________________ Friday 02 Apr 1993 From 17:34:05 Until 18:11:08 Time logged : 0 hrs 37.05667 mins Total Time project: 430 hrs 1.72 mins Activities: Aileron hookup modifications. Right wing. _________________________________________________________________ Saturday 03 Apr 1993 From 10:04:12 Until 12:27:22 Time logged : 2 hrs 23.1583 mins Total Time project: 432 hrs 24.88 mins Activities: Mounted solinoid. Ran battery cable. _________________________________________________________________ Saturday 03 Apr 1993 From 12:52:13 Until 15:59:33 Time logged : 3 hrs 7.3367 mins Total Time project: 435 hrs 32.22 mins Activities: Wired up rest of engine electrics. Started engine for first time. _________________________________________________________________ Sunday 04 Apr 1993 From 11:38:52 Until 13:11:29 Time logged : 1 hrs 32.62267 mins Total Time project: 437 hrs 4.84 mins Activities: Fixed CHT probe problem. Started tear down on tail. _________________________________________________________________ Sunday 04 Apr 1993 From 15:16:45 Until 16:12:34 Time logged : 0 hrs 55.82167 mins Total Time project: 438 hrs 0.66 mins Activities: Preping left wing for varnishing. _________________________________________________________________ Monday 05 Apr 1993 From 10:23:37 Until 14:11:57 Time logged : 3 hrs 48.3243 mins Total Time project: 441 hrs 48.98 mins Activities: Dissasembled fuselage and tail. _________________________________________________________________ Monday 05 Apr 1993 From 14:46:33 Until 16:02:04 Time logged : 1 hrs 15.52967 mins Total Time project: 443 hrs 4.51 mins Activities: Disassembled empanage. _________________________________________________________________ Friday 09 Apr 1993 From 13:29:41 Until 16:31:22 Time logged : 3 hrs 1.6833 mins Total Time project: 446 hrs 6.19 mins Activities: Covered fin and rudder. _________________________________________________________________ Saturday 10 Apr 1993 From 13:59:00 Until 15:53:25 Time logged : 1 hrs 54.4073 mins Total Time project: 448 hrs 0.60 mins Activities: Prepared horizontal stab for covering. Disassembled landing gear. _________________________________________________________________ Sunday 11 Apr 1993 From 12:20:46 Until 12:37:49 Time logged : 0 hrs 17.05933 mins Total Time project: 448 hrs 17.66 mins Activities: Cut out fabric for horizontal stab. _________________________________________________________________ Monday 12 Apr 1993 From 15:53:11 Until 19:16:32 Time logged : 3 hrs 23.344 mins Total Time project: 451 hrs 41.00 mins Activities: Covered horizontal stab. _________________________________________________________________ Tuesday 13 Apr 1993 From 14:16:42 Until 16:07:12 Time logged : 1 hrs 50.5077 mins Total Time project: 453 hrs 31.51 mins Activities: Preparing fuselage for covering. _________________________________________________________________ Tuesday 13 Apr 1993 From 16:58:21 Until 18:23:36 Time logged : 1 hrs 25.248 mins Total Time project: 454 hrs 56.76 mins Activities: Covered a landing gear leg. _________________________________________________________________ Wednesday 14 Apr 1993 From 12:49:54 Until 15:04:20 Time logged : 2 hrs 14.436 mins Total Time project: 457 hrs 11.20 mins Activities: Covered bottom of fuselage. _________________________________________________________________ Wednesday 14 Apr 1993 From 15:50:54 Until 18:24:14 Time logged : 2 hrs 33.338 mins Total Time project: 459 hrs 44.54 mins Activities: Covering fuselage right side. _________________________________________________________________ Wednesday 14 Apr 1993 From 18:55:22 Until 19:59:17 Time logged : 1 hrs 3.92167 mins Total Time project: 460 hrs 48.46 mins Activities: Covering fuselage. _________________________________________________________________ Thursday 15 Apr 1993 From 13:29:31 Until 16:40:41 Time logged : 3 hrs 11.163 mins Total Time project: 463 hrs 59.62 mins Activities: Covering fuselage. _________________________________________________________________ Thursday 15 Apr 1993 From 18:33:24 Until 21:35:33 Time logged : 3 hrs 2.1377 mins Total Time project: 467 hrs 1.76 mins Activities: Covered fuselage left side. _________________________________________________________________ Friday 16 Apr 1993 From 20:18:06 Until 21:39:43 Time logged : 1 hrs 21.62767 mins Total Time project: 468 hrs 23.39 mins Activities: Covered front turtle deck. _________________________________________________________________ Saturday 17 Apr 1993 From 20:23:15 Until 21:32:54 Time logged : 1 hrs 9.653 mins Total Time project: 469 hrs 33.04 mins Activities: Preparing rear turtle deck for cover. _________________________________________________________________ Monday 19 Apr 1993 From 10:53:49 Until 12:01:57 Time logged : 1 hrs 8.141 mins Total Time project: 470 hrs 41.18 mins Activities: Covered rear turtle deck. _________________________________________________________________ Tuesday 20 Apr 1993 From 14:53:48 Until 16:39:38 Time logged : 1 hrs 45.8453 mins Total Time project: 472 hrs 27.03 mins Activities: Covered LG leg. Cabin trim work. _________________________________________________________________ Wednesday 21 Apr 1993 From 14:37:23 Until 16:10:08 Time logged : 1 hrs 32.75333 mins Total Time project: 473 hrs 59.78 mins Activities: Covered door. _________________________________________________________________ Friday 23 Apr 1993 From 12:56:45 Until 15:37:07 Time logged : 2 hrs 40.3643 mins Total Time project: 476 hrs 40.14 mins Activities: Covered elevator. _________________________________________________________________ Saturday 24 Apr 1993 From 21:01:52 Until 22:52:10 Time logged : 1 hrs 50.3123 mins Total Time project: 478 hrs 30.45 mins Activities: Varnished on wings. _________________________________________________________________ Sunday 25 Apr 1993 From 10:01:59 Until 12:23:46 Time logged : 2 hrs 21.793 mins Total Time project: 480 hrs 52.24 mins Activities: Covering cabin part of fuselage. _________________________________________________________________ Sunday 25 Apr 1993 From 16:44:45 Until 20:01:27 Time logged : 3 hrs 16.6937 mins Total Time project: 484 hrs 8.93 mins Activities: Finished fuselage covering. _________________________________________________________________ Wednesday 28 Apr 1993 From 18:01:18 Until 19:28:53 Time logged : 1 hrs 27.592 mins Total Time project: 485 hrs 36.52 mins Activities: Covered bottom of left wing. _________________________________________________________________ Thursday 29 Apr 1993 From 19:49:04 Until 21:12:49 Time logged : 1 hrs 23.75633 mins Total Time project: 487 hrs 0.28 mins Activities: Backed fabric around strut brackets. Installed pitot tube in wing. _________________________________________________________________ Saturday 01 May 1993 From 15:40:03 Until 17:41:30 Time logged : 2 hrs 1.4517 mins Total Time project: 489 hrs 1.73 mins Activities: Glued bottom of ribs to fabric. Started on top cover.(Left Wing) _________________________________________________________________ Saturday 01 May 1993 From 20:29:15 Until 22:30:28 Time logged : 2 hrs 1.227 mins Total Time project: 491 hrs 2.96 mins Activities: Glued fabric to top ribs. _________________________________________________________________ Sunday 02 May 1993 From 15:41:09 Until 18:02:38 Time logged : 2 hrs 21.4853 mins Total Time project: 493 hrs 24.45 mins Activities: Finished covering left wing. (aileron not included) _________________________________________________________________ Monday 03 May 1993 From 14:52:03 Until 17:41:11 Time logged : 2 hrs 49.129 mins Total Time project: 496 hrs 13.58 mins Activities: Sanding and prep for covering. (right wing) _________________________________________________________________ Monday 03 May 1993 From 20:50:14 Until 22:52:11 Time logged : 2 hrs 1.952 mins Total Time project: 498 hrs 15.53 mins Activities: Fuel tank cover cut and fit. Drilled and riveted aileron control rods. _________________________________________________________________ Tuesday 04 May 1993 From 11:33:37 Until 12:57:43 Time logged : 1 hrs 24.10833 mins Total Time project: 499 hrs 39.64 mins Activities: Tacked fabric to lower right wing. Ready to shrink. _________________________________________________________________ Tuesday 04 May 1993 From 14:37:38 Until 17:59:45 Time logged : 3 hrs 22.1323 mins Total Time project: 503 hrs 1.77 mins Activities: Shrunk bottom cover and tacked on top cover. (right wing). _________________________________________________________________ Thursday 06 May 1993 From 11:12:27 Until 12:50:52 Time logged : 1 hrs 38.42167 mins Total Time project: 504 hrs 40.19 mins Activities: Finished covering right wing. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Monday 10 May 1993 Time Logged : 2 hrs 46 mins Total Time Project: Activities: Finished covering aileron for right wing. Started on right aileron _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Tuesday 11 May 1993 Time Logged : 2 hrs 45 mins Total Time Project: Activities: Finished covering right aileron. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Friday 14 May 1993 Time Logged : 1 hrs 10 mins Total Time Project: Activities: Ironed down fabric edges on fuselage. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Saturday 15 May 1993 Time Logged : 1 hrs 35 mins Total Time Project: Activities: Started doping fuselage. (Dacproofing). _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Sunday 16 May 1993 Time Logged : 1 hrs 20 mins Total Time Project: Activities: Dopeing on the fuselage. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Monday 17 May 1993 Time Logged : 2 hrs 20 mins Total Time Project: Activities: Doping fuse and started doping tail feathers. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Tuesday 18 May 1993 Time Logged : 2 hrs 35 mins Total Time Project: Activities: Doped botton of fuselage and one side of tail surfaces. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Saturday 22 May 1993 Time Logged : 1 hrs 40 mins Total Time Project: Activities: Doping on second coats on fuselage and tail. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Sunday 23 May 1993 Time Logged : 2 hrs 10 mins Total Time Project: Activities: Doping on ailerons and wingtips. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Monday 24 May 1993 Time Logged : 1 hrs 5 mins Total Time Project: Activities: Second coat of dope on ailerons. Ironing. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Wednesday 26 May 1993 Time Logged : 0 hrs 50 mins Total Time Project: Activities: Touching up with dope on light spots. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Saturday 29 May 1993 Time Logged : 2 hrs 20 mins Total Time Project: Activities: Started spray application of SpraFil on fuselage. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Sunday 30 May 1993 Time Logged : 1 hrs 43 mins Total Time Project: Activities: Second coat of SpraFil appied to fuselage. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Tuesday 1 June 1993 Time Logged : 2 hrs 23 mins Total Time Project: Activities: More SpraFil on fuse and on tail. Painted LG struts Yello. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Wednesday 2 June 1993 Time Logged : 2 hrs 37 mins Total Time Project: Activities: Third crosscoat of sprafil. Sparyed some yellow on horizontal stab. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Saturday 05 June 1993 Time Logged : 2 hrs 00 mins Total Time Project: Activities: Attempted more painting with yellow. Problems with something in the paint. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Monday 07 June 1993 Time Logged : 1 hrs 20 mins Total Time Project: Activities: Still no success with paint. Close inspection of paint shows what appears to be little (Grain of sand) pieces of pigment. _________________________________________________________________ NOTE: The entrys for the next month were input manually due to an electrical storm that destroyed my computer. Automated logging was not available during this time. Tuesday June 08 1993 Time Logged : 3 hrs 20 mins Total Time Project: Activity+s: SuperFlight was called and said that paint must be defective and I was not to use it. Another gallon will be sent. _________________________________________________________________ NOTE: Automated time keeping back on line. Friday 18 Jun 1993 From 10:14:36 Until 11:06:39 Time logged : 0 hrs 52.05967 mins Total Time project: 541 hrs 13.32 mins Activities: First coat of Dacproofer on right wing. _________________________________________________________________ Friday 18 Jun 1993 From 13:17:18 Until 13:43:00 Time logged : 0 hrs 25.68967 mins Total Time project: 541 hrs 39.01 mins Activities: Sprayed on second coat of dacproofer. _________________________________________________________________ Friday 18 Jun 1993 From 14:37:29 Until 15:13:36 Time logged : 0 hrs 36.10933 mins Total Time project: 542 hrs 15.12 mins Activities: First coat Dacproofing on bottom of right wing. _________________________________________________________________ Friday 18 Jun 1993 From 15:42:33 Until 16:17:12 Time logged : 0 hrs 34.64933 mins Total Time project: 542 hrs 49.77 mins Activities: Sprayed second coat of dac on bottom right wing _________________________________________________________________ Saturday 19 Jun 1993 From 09:10:25 Until 10:01:59 Time logged : 0 hrs 51.56567 mins Total Time project: 543 hrs 41.34 mins Activities: First coat sprafil on bottom of right wing. _________________________________________________________________ Saturday 19 Jun 1993 From 10:43:17 Until 12:38:30 Time logged : 1 hrs 55.2203 mins Total Time project: 545 hrs 36.56 mins Activities: Second coat Spra-fill on bottom of right wing. First on the top. _________________________________________________________________ Saturday 19 Jun 1993 From 13:19:39 Until 13:46:14 Time logged : 0 hrs 26.599 mins Total Time project: 546 hrs 3.16 mins Activities: Final coat of spry-fill on right wing. Wing ready for color coat. _________________________________________________________________ Thursday 24 Jun 1993 From 16:34:19 Until 17:29:45 Time logged : 0 hrs 55.43667 mins Total Time project: 546 hrs 58.60 mins Activities: Applying paint to tail feathers. _________________________________________________________________ Thursday 24 Jun 1993 From 18:21:06 Until 19:42:03 Time logged : 1 hrs 20.95767 mins Total Time project: 548 hrs 19.56 mins Activities: Painted on tail surfaces. (grey) _________________________________________________________________ Friday 25 Jun 1993 From 11:36:24 Until 17:13:23 Time logged : 5 hrs 36.9827 mins Total Time project: 553 hrs 56.54 mins Activities: Mostly a wasted day. Stripped fabric off of horizontal because of a paint problem. Dacproofed left wing. _________________________________________________________________ Saturday 26 Jun 1993 From 10:24:23 Until 11:12:13 Time logged : 0 hrs 47.84067 mins Total Time project: 554 hrs 44.38 mins Activities: First coat spra-fil on left wing bottom. _________________________________________________________________ Saturday 26 Jun 1993 From 12:43:40 Until 13:10:04 Time logged : 0 hrs 26.40633 mins Total Time project: 555 hrs 10.79 mins Activities: First coat spra-fil on top of left wing. _________________________________________________________________ Saturday 26 Jun 1993 From 13:43:41 Until 13:58:07 Time logged : 0 hrs 14.44233 mins Total Time project: 555 hrs 25.23 mins Activities: Second coat spra-fil top of left wing. _________________________________________________________________ Saturday 26 Jun 1993 From 14:44:34 Until 15:03:44 Time logged : 0 hrs 19.15733 mins Total Time project: 555 hrs 44.39 mins Activities: Second coat spra-fil in bottom of left wing. _________________________________________________________________ Sunday 27 Jun 1993 From 12:12:05 Until 12:28:04 Time logged : 0 hrs 15.979 mins Total Time project: 556 hrs 0.37 mins Activities: Painted bottom of fuselage. _________________________________________________________________ Sunday 27 Jun 1993 From 13:02:25 Until 13:43:33 Time logged : 0 hrs 41.13633 mins Total Time project: 556 hrs 41.51 mins Activities: Sprayed sides of fuselage . _________________________________________________________________ Monday 28 Jun 1993 From 08:53:29 Until 09:12:59 Time logged : 0 hrs 19.50567 mins Total Time project: 557 hrs 1.02 mins Activities: Worked on landing gear strut. _________________________________________________________________ Monday 28 Jun 1993 From 09:55:15 Until 10:23:26 Time logged : 0 hrs 28.185 mins Total Time project: 557 hrs 29.21 mins Activities: Painted aileron outter ends (Grey) _________________________________________________________________ Monday 28 Jun 1993 From 12:15:01 Until 12:29:04 Time logged : 0 hrs 14.04533 mins Total Time project: 557 hrs 43.26 mins Activities: Sprayed outer part of right wing grey. _________________________________________________________________ Tuesday 29 Jun 1993 From 16:15:30 Until 19:04:50 Time logged : 2 hrs 49.348 mins Total Time project: 560 hrs 32.61 mins Activities: Reinstalled landing gear. _________________________________________________________________ Thursday 01 Jul 1993 From 12:21:08 Until 13:23:11 Time logged : 1 hrs 2.04333 mins Total Time project: 561 hrs 34.65 mins Activities: Recovered bottom of horizontal stab. _________________________________________________________________ Thursday 01 Jul 1993 From 14:20:43 Until 16:44:18 Time logged : 2 hrs 23.578 mins Total Time project: 563 hrs 58.23 mins Activities: Finished covering Horizontal stab. _________________________________________________________________ Friday 02 Jul 1993 From 12:45:04 Until 14:07:17 Time logged : 1 hrs 22.22567 mins Total Time project: 565 hrs 20.46 mins Activities: Completed Dacproofing stab. Taped fin in prep for red paint. _________________________________________________________________ Saturday 03 Jul 1993 From 12:43:17 Until 13:14:48 Time logged : 0 hrs 31.52133 mins Total Time project: 565 hrs 51.98 mins Activities: Finished out spra-fill on horizontal stab. _________________________________________________________________ Saturday 03 Jul 1993 From 14:03:47 Until 15:00:44 Time logged : 0 hrs 56.956 mins Total Time project: 566 hrs 48.94 mins Activities: Taped fuselage in prep for red paint. _________________________________________________________________ Sunday 04 Jul 1993 From 06:27:57 Until 07:12:38 Time logged : 0 hrs 44.691 mins Total Time project: 567 hrs 33.63 mins Activities: Sprayed grey on horizontal stab. Except for cowl, this completes the grey. _________________________________________________________________ Sunday 04 Jul 1993 From 12:52:41 Until 14:14:50 Time logged : 1 hrs 22.15267 mins Total Time project: 568 hrs 55.78 mins Activities: Taped and prepared fuselage for red paint. _________________________________________________________________ Monday 05 Jul 1993 From 06:39:41 Until 09:26:22 Time logged : 2 hrs 46.686 mins Total Time project: 571 hrs 42.47 mins Activities: Painted top of fuselage red. _________________________________________________________________ Wednesday 07 Jul 1993 From 09:25:54 Until 12:47:45 Time logged : 3 hrs 21.846 mins Total Time project: 575 hrs 4.32 mins Activities: Finished up painting horizontal stab. Reassembled tail group. _________________________________________________________________ Thursday 08 Jul 1993 From 09:37:32 Until 10:23:52 Time logged : 0 hrs 46.33933 mins Total Time project: 575 hrs 50.66 mins Activities: More reassembly work. _________________________________________________________________ Thursday 08 Jul 1993 From 10:27:41 Until 12:41:13 Time logged : 2 hrs 13.5383 mins Total Time project: 578 hrs 4.20 mins Activities: Reassembled rudder and tailwheel cables. Tail group fairing. _________________________________________________________________ Tuesday 13 Jul 1993 From 14:00:19 Until 15:38:38 Time logged : 1 hrs 38.315 mins Total Time project: 579 hrs 42.52 mins Activities: Reinstalling control systems. _________________________________________________________________ Thursday 15 Jul 1993 From 13:32:25 Until 14:10:34 Time logged : 0 hrs 38.15933 mins Total Time project: 580 hrs 20.68 mins Activities: Brake work. _________________________________________________________________ Thursday 15 Jul 1993 From 16:47:12 Until 17:02:27 Time logged : 0 hrs 15.25533 mins Total Time project: 580 hrs 35.94 mins Activities: Minor assembly work on controls. _________________________________________________________________ Thursday 15 Jul 1993 From 22:18:36 Until 23:24:52 Time logged : 1 hrs 6.26833 mins Total Time project: 581 hrs 42.21 mins Activities: Mounting spinner. _________________________________________________________________ Friday 16 Jul 1993 From 09:46:44 Until 11:37:32 Time logged : 1 hrs 50.8107 mins Total Time project: 583 hrs 33.02 mins Activities: Finished mounting spinner. Worked on brakes. _________________________________________________________________ Friday 16 Jul 1993 From 12:24:35 Until 16:35:29 Time logged : 4 hrs 10.9037 mins Total Time project: 587 hrs 43.92 mins Activities: Lower part of brakes finished and installed. Swagging rudder cables. _________________________________________________________________ Tuesday 20 Jul 1993 From 18:11:53 Until 20:29:23 Time logged : 2 hrs 17.5017 mins Total Time project: 590 hrs 1.42 mins Activities: Cut baffles for engine air intakes. Trimmed rear of spinner. _________________________________________________________________ Wednesday 21 Jul 1993 From 10:35:38 Until 12:04:55 Time logged : 1 hrs 29.282 mins Total Time project: 591 hrs 30.70 mins Activities: Primed cowl and spinner for paint. _________________________________________________________________ Wednesday 21 Jul 1993 From 20:40:58 Until 22:57:31 Time logged : 2 hrs 16.55 mins Total Time project: 593 hrs 47.25 mins Activities: Brake installation completed. _________________________________________________________________ Friday 23 Jul 1993 From 10:12:05 Until 12:54:58 Time logged : 2 hrs 42.8943 mins Total Time project: 596 hrs 30.15 mins Activities: Installed skylight. _________________________________________________________________ Saturday 24 Jul 1993 From 07:35:20 Until 12:13:21 Time logged : 4 hrs 38.0187 mins Total Time project: 601 hrs 8.17 mins Activities: Painted cowl grey. Installed recess for left breather. Grommets in for cable. _________________________________________________________________ Saturday 24 Jul 1993 From 13:04:43 Until 15:11:27 Time logged : 2 hrs 6.7333 mins Total Time project: 603 hrs 14.90 mins Activities: Remounted engine and cowl. Engine wiring hook up. _________________________________________________________________ Sunday 25 Jul 1993 From 10:09:07 Until 11:59:04 Time logged : 1 hrs 49.9497 mins Total Time project: 605 hrs 4.85 mins Activities: Painted cowl, spinner and fuel tank covers. _________________________________________________________________ Sunday 25 Jul 1993 From 12:36:38 Until 14:01:07 Time logged : 1 hrs 24.48567 mins Total Time project: 606 hrs 29.34 mins Activities: Installed muffler. Adjustments to engine mount. _________________________________________________________________ Tuesday 27 Jul 1993 From 07:42:00 Until 09:26:08 Time logged : 1 hrs 44.1327 mins Total Time project: 608 hrs 13.47 mins Activities: Painted red on left wing. _________________________________________________________________ Tuesday 27 Jul 1993 From 20:54:24 Until 21:14:51 Time logged : 0 hrs 20.46467 mins Total Time project: 608 hrs 33.94 mins Activities: Prepared left wing for painting. _________________________________________________________________ Wednesday 28 Jul 1993 From 07:27:42 Until 09:40:49 Time logged : 2 hrs 13.1097 mins Total Time project: 610 hrs 47.05 mins Activities: Finished preping and painting left wing. _________________________________________________________________ Wednesday 28 Jul 1993 From 13:11:42 Until 15:21:38 Time logged : 2 hrs 9.927 mins Total Time project: 612 hrs 56.98 mins Activities: Finishing work. _________________________________________________________________ Monday 02 Aug 1993 From 19:47:08 Until 21:10:38 Time logged : 1 hrs 23.50767 mins Total Time project: 614 hrs 20.49 mins Activities: Torqued engine bolts and reduction assembley to specs. _________________________________________________________________ Wednesday 04 Aug 1993 From 20:47:48 Until 23:12:25 Time logged : 2 hrs 24.6217 mins Total Time project: 616 hrs 45.11 mins Activities: Pitot work completed. Changed screws in windows. _________________________________________________________________ Saturday 07 Aug 1993 From 19:17:58 Until 21:06:56 Time logged : 1 hrs 48.969 mins Total Time project: 618 hrs 34.08 mins Activities: Installed EGT system. _________________________________________________________________ Tuesday 10 Aug 1993 From 15:21:05 Until 15:48:21 Time logged : 0 hrs 27.27267 mins Total Time project: 619 hrs 1.35 mins Activities: Made small lexan fairings for rudder cables exits. _________________________________________________________________ Tuesday 17 Aug 1993 From 15:14:08 Until 17:46:35 Time logged : 2 hrs 32.4523 mins Total Time project: 621 hrs 33.80 mins Activities: Saftey wired prop and turnbuckles. Drilled strut and wheel bolt holes. _________________________________________________________________ Sunday 22 Aug 1993 From 10:04:53 Until 11:38:42 Time logged : 1 hrs 33.82933 mins Total Time project: 623 hrs 7.63 mins Activities: Determined the total weight and CG. _________________________________________________________________ Tuesday 24 Aug 1993 From 12:09:46 Until 15:01:04 Time logged : 2 hrs 51.313 mins Total Time project: 625 hrs 58.94 mins Activities: Engine breakin complete. Wiring changes made to hobbs. _________________________________________________________________ Friday 27 Aug 1993 From 11:59:04 Until 13:20:01 Time logged : 1 hrs 20.96267 mins Total Time project: 627 hrs 19.90 mins Activities: Engine testing. Mounted battery box. _________________________________________________________________ Friday 10 Sep 1993 From 08:02:48 Until 08:47:58 Time logged : 0 hrs 45.15933 mins Total Time project: 628 hrs 5.06 mins Activities: Mounted radio. installed headset adapter. Minor detail work. Aircraft is complete and ready to fly except for seat cushions. _________________________________________________________________ Thursday 30 Sep 1993 From 15:04:52 Until 15:04:53 Time logged : 0 hrs 0.02066667 mins Total Time project: 628 hrs 5.08 mins Activities: All entries after this point are for aircraft logbook entries only.. Aircraft is considered complete and ready to fly at this point. _________________________________________________________________ Thursday 30 Sep 1993 From 15:05:27 Until 16:47:29 Time logged : 1 hrs 42.0253 mins Total Time project: 629 hrs 47.11 mins Activities: Marked fuel levels in left wing tank. Made prototype left cabin window. _________________________________________________________________